New bridge built over Trishuli at an investment of Rs 80 million

Trishuli (Nuwakot),Nov.14: A new concrete bridge has been constructed over the Trishuli River in Bidur Municipality in Nuwakot district for Rs 80 million after the truss bridge which was built in 1963 got dilapidated. 

According to Mayor of Bidur Municipality Rajan Shrestha, the commute of locals of Nuwakot and Dhading has become efficient as the heavy loads of vehicles can pass through the new concrete bridge 

The government has invested Rs 80 million in a two-lane bridge which is eleven meters wide. 

According to the Ministry of Physical Infrastructure and Transport, the bridge that is built using the “Box Coder Priestess” technology under the “Design and Build Model” is safe, strong, and has more load capacity. 

Transport facilities have been operated from the newly constructed bridge.

The previous truss bridge had a single lane with a capacity of eight metric tons. The carrying capacity of this bridge is 35 metric tons. (Translated from RSS)

  • Nepal News Agenacy Pvt. Ltd.

  • Putalisadak, Kathmandu Nepal

  • 01-4011122, 01-4011124

  • [email protected]

  • Department of Information and Broadcasting Regd.No. 2001।077–078

©2024 Nepal Page | Website by appharu.com

Our Team

Editorial Board